Comprehensive Plan

2009 Comprehensive Plan is now on-line

The 2009 Comprehensive Plan has been adopted by the Planning and Zoning Commission and an electronic version may be obtained by following the link below.

2009 Comprehensive Plan - Follow this link to view an electronic version of the Plan (This file may take a few minutes to download).

Comprehensive Plan Updates

In addition to the Comprehensive Plan, the Community Development Department has begun to undertake more detailed level surveys and is currently studying the Airport Road Corridor and the Frost Avenue Corridor for consideration of potential future projects such as streetscape enhancements and other projects to enhance these vital corridors within the community.  The Department has developed several graphics that represent analysis of existing conditions and conceptual drawings that look to address the needs of both corridors.

Follow the links provided below to access these conceptual drawings.

For more information regarding the 2009 Comprehensive Plan or to become involved please contact the Department of Community Development.

Contact Us

City Hall
8425 Airport Rd
Berkeley, MO 63134
Get Directions

In this Department

Topics of Interest